Nishi FamilyCompare › Heavy-Appliance Mobility

Nishi Compare · measured, not asserted

Heavy-Appliance Mobility

Nishi vs the field — every Nishi cell is measured against real organ source at emit time; each gap names the watch contract that will close it.

Nishi glide-base plus stair-module appliance mover (designed from the first bit up) vs Airsled air film and Escalera StairCat and PowerMate motorized climbers and tracked crawler dollies -- Aug-2026 field

Layer 1 · Executive

Where we are. MEASURED 2026-08-19: no Nishi hardware exists in this domain. What IS measured in tree: the product decomposer (pd_parse), the sovereign STL-to-G-code slicer (printed fixtures), the landed-cost corridor engine (lc_calc) and the sourcing-mix reshore pricer (sp_mix) -- the design-to-business substrate every physical product inherits. The Aug-2026 field is mapped and mirrored: air film for floors, dealer-priced motorized climbers at 1200 to 1,500 lb, consumer tracked crawlers in the 330 lb class.

Where we need to go. OPERATOR ASK (2026-08-19): easy-glide wheels for heavy appliances that can even go up stairs. The wedge no incumbent spans: a PERMANENT under-appliance glide base that mates with a detachable stair-climb module. Ship the design organs first and prove them by gates, steel second -- the physics and costing organs are reusable across every physical product that follows.

The unit. 1 u = one measured session-leg (organ plus gate plus live flip), the mangagen and comms calibration.
Cost to a proven design engine: 4 u. AM1 stair envelope, AM2 load margins, AM3 tipover, AM4 brake energy -- each a gated organ with a pre-declared refusal rule; pure organ work on the existing substrate.
Cost to a priced BOM and a buy-vs-build verdict: 2 u more. AM5 composes lc_calc corridors and sp_mix reshore paths over the real part list; the biz table below regenerates from it. 6 u cumulative.
Cost to a field-proven first article: 4 u more plus hardware. AM6 glide-base pack and AM7 field gate; cash exposure before steel is one crawler teardown unit [crawler] and printed fixture stock. 10 u cumulative.

Research bar. PowerMate automatic braking, the field safety bar is measured on operator-release lock behaviour documented across the powered-climber field. Theirs: the load locks in place the instant the operator releases the controls [@powermate]. Ours: our AM4 contract adopts lock-on-release as a REFUSAL rule -- a design that cannot lock does not pass its gate.

Business case

AxisPositionFiguresDecision
InvestmentThe design-engine leg is pure organ work on the existing substrate; hardware spend begins at one consumer crawler teardown unit in the 330 lb class [crawler] plus printed fixturesestimated 10 u to a field-proven article; cash before steel is bounded by the teardown unit and fixture stockfund the organ leg now, gate hardware spend on the M1 BOM verdict
MarketThree incumbent formats and none spans the ask: air film for finished floors [airsled], dealer-channel motorized climbers at 1200 to 1,500 lb [escalera] [powermate] [liftkar], consumer tracked crawlers [crawler]the permanent glide base plus stair module covers a gap no format servesposition retrofit-first: the base addresses every appliance owner, the module addresses movers and property managers
Opportunity costThe same 10 u could extend an existing revenue lane; the offset is that AM1-AM5 are reusable physics and costing organs every later physical product inheritsthe first product pays the substrate tax for the whole physical lanecharge the substrate to the physical-products program, not to this product alone
Go to marketMovers, appliance dealers and property managers buy outcomes, not tools; the incumbent climbers sell through dealers and rentals [liftkar]house-call service pricing per move is the proven channel shapestart with the service wedge to fund the product wedge; the GTM facade ranks channels once cotton-style channel rows are admitted
Buy vs buildAir film, powered climbers and crawlers are mature BUYS for internal moving needs today [airsled] [powermate]nothing on the market is a permanent under-appliance base with a stair modulebuy one crawler for teardown reference; build only the wedge

6 of 15 capabilities measured|1 of them measured exceeds|9 open|coverage 400/1000|adoption 2 full / 4 partial

Layer 2 · Roadmap

Do this next — computed by the ranker, never chosen by a seat

Order from nx_compare_rank (nx_dr_ocm: (deficit + cost-of-delay + option + enables) x sponsor x self-sufficiency x momentum / cost). FINISH rows are rungs whose symbol is present but whose organ is short of full adoption: the cheapest closures on this board, listed before any new work. Stamp: # asof=1787883542 domain=appliancemove target_version=0.1 rungs=7 done=0 open=7 finish=0 ranker=nx_dr_ocm

#StageRungPriorityDerivation
#10.1Load and margin calculator (AM2) am_load_margin18000v=18 m=1 c=1
#20.1Stair-geometry envelope solver (AM1) am_stair_geom12000v=12 m=1 c=1
#30.1Descent brake-energy model and lock spec (AM4) am_brake_energy6000v=6 m=1 c=1
#40.1CG tipover simulator (AM3) am_tipover_sim4000v=4 m=1 c=1
#5laterGlide-base design pack (AM6) am_glide_base2333v=7 m=1 c=3
#6laterField-trial gate (AM7) am_field_gate1333v=4 m=1 c=3
#7laterBOM, landed cost and sourcing verdict (AM5) am_bom_cost0v=0 m=1 c=20

Critical path — contract, done-rule, executor, cost

RungCloses withDefinition of done (pre-declared)ExecutorEst.
Stair-geometry envelope solver (AM1)am_stair_geomOSHA 1910.25 riser and tread envelope as DATA rows [@oshastairs]; solver derives module geometry; gate includes a neg-control stair outside the envelope that must REFUSEOrgan1 u
Load and margin calculator (AM2)am_load_marginBOM-derived axle, bearing and deck margins; gate refuses any margin under the declared floor; capacities graded beside the 1200 and 1,500 lb incumbents [@escalera] [@powermate]Organ1 u
CG tipover simulator (AM3)
after AM1
am_tipover_simstair rake and load-height sweep; neg-control fixture MUST tip; verdict carries the margin number, never a bare passOrgan1 u
Descent brake-energy model and lock spec (AM4)
after AM2
am_brake_energyworst-case descent energy vs brake rating with lock-on-release as the refusal rule [@powermate]Organ1 u
BOM, landed cost and sourcing verdict (AM5)
after AM2
am_bom_costevery component priced through lc_calc corridors and sp_mix reshore path; buy-vs-build table regenerates from the organ outputOrgan2 u
Glide-base design pack (AM6)
after AM2
am_glide_basefloor-pressure model vs flooring classes as DATA graded beside the air-film bar [@airsled]; footprint fit rows for common appliances; printed-fixture lane via the slicerOrgan2 u
Field-trial gate (AM7)
after AM3,AM4,AM6
am_field_gatedeclared stair fixtures, measured climbs, descents, aborts and floor inspections; REFUSES on partial coverageOrgan2 u

Milestones

MilestoneRungsCumulative
M0 · Design engine provenAM1,AM2,AM3,AM44 u
M1 · Priced and sourcedAM56 u
M2 · Prototype-ready packAM68 u
M3 · Field-proven articleAM710 u
Layer 3 · Engineering
How this is scored. Every Nishi mark is measured: the generator reads the real organ source on disk and requires the implementing symbol to exist (no self-grading). A watching tag names the organ and symbol contracted to close a gap — the mark flips itself on the next compare beat when that workstream ships, and the comparewatch- plane row flips with it. The flip is necessary, not sufficient: it proves the symbol exists, never that the capability is good. The bar is the rung's pre-declared done-rule, proven by its gate — a symbol shipped without the behaviour behind it is a defect, and the flip is exactly what makes that defect visible instead of quiet. Competitor marks record documented capability presence — presence, not depth or scale. Adoption is measured too: every measured row carries where its organ stands on the estate's ladder (source → built → promoted → registered → invoked; libraries by importer reach minus validation importers; gates by the execution surfaces that run them). A row is fully adopted only at the top of its ladder; anything short is tagged partial with the exact remedy, so a build nobody promoted can no longer read as shipped. Census stamps: importers asof 1787849099, gate census asof 1787855507 (unix seconds; -1 = census absent).

Capability matrix — measured against source

leads / measured exceed present partial absent · click any capability for its evidence

CapabilityNishiAirsledEscaleraPowerMateCrawler dolly
GLIDE
Move a heavy appliance across finished floors without damageOpen — watching runtime/nx_applmove.nx : am_glide_base, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Airsled floats the load on an air film so finished floors never see a wheel [airsled]; climbers and crawlers roll on wheels or tracks and protect floors only as well as their tread. Contract = the glide-base design organ: wheel material, footprint pressure and floor-damage model as DATA rows, proven by a floor-pressure gate
watching am_glide_base
Permanent under-appliance install (a retrofit base that stays)Open — watching runtime/nx_applmove.nx : am_base_fit, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. No incumbent in this field stays under the appliance -- movers arrive, move and leave; adjustable roller bases exist as a commodity adjacent market but do not climb. Contract = a base that fits common appliance footprints as DATA (width, depth, load), glides on demand and locks solid otherwise
watching am_base_fit
STAIRS
Powered ascent and descent with loadOpen — watching runtime/nx_applmove.nx : am_stair_geom, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Escalera and PowerMate own this format at 1200 and 1,500 lb ratings [escalera] [powermate]; crawlers do it at consumer price in the 330 lb class [crawler]. Contract = the stair-geometry envelope solver: riser and tread limits read from the published envelope [oshastairs] as DATA, module geometry derived from it
watching am_stair_geom
Automatic load lock on release (the safety bar)Open — watching runtime/nx_applmove.nx : am_brake_energy, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. The PowerMate braking behaviour locks the load in place the moment the operator releases the controls [powermate] -- the field safety bar. Contract = the descent brake-energy model and lock spec, proven by a gate that refuses any design whose worst-case descent energy exceeds the brake rating
watching am_brake_energy
Tipover stability margin, modeled not guessedOpen — watching runtime/nx_applmove.nx : am_tipover_sim, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Incumbents publish capacities, not stability envelopes. Contract = the CG-tipover simulator over stair rake, load height and operator input, with a neg-control fixture that MUST tip
watching am_tipover_sim
LOAD
Rated capacity in the appliance class (600 lb and up)Open — watching runtime/nx_applmove.nx : am_load_margin, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Escalera rates 1200 lb [escalera], PowerMate 1,500 lb [powermate], the Liftkar line covers the mid-range [liftkar], crawler dollies start near 330 lb [crawler]. Contract = the load and margin calculator: axle, bearing, deck and weld margins derived from the BOM as DATA
watching am_load_margin
Single-operator useOpen — watching runtime/nx_applmove.nx : am_solo_op, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Every incumbent format is single-operator by design; ours must be too or it loses the house call
watching am_solo_op
DESIGN
Outcome-to-capability decomposition (name the product, derive the gaps)Measured exceed: pd_parse in runtime/_hdl_build/nx_product_decompose.nx, verified at emit. The estate product decomposer maps a named outcome onto required capabilities and unproven-opportunity gaps over the design-to-market planes -- no incumbent ships its analysis lane Adoption: REGISTERED-DARK — PARTIAL: callable, authorised, no MCP invocation on record (a direct fork logs the runner, so this is not proof it never ran); no execution surface runs it either (clock, cron, daemon, roster, actlog and surfaced forks checked).
adoption REGISTERED-DARK
Digital-twin fabrication lane (STL to G-code, printed fixtures)Open — no implementing organ is measured for this axis yet. The sovereign slicer emits G-code from STL for printed prototype fixtures -- the prototype lane runs on the estate fabrication substrate, not a vendor toolchain
BUSINESS
Landed-cost and tariff corridor pricing for the BOMMeasured: lc_calc exists in runtime/_hdl_build/nx_landed_cost.nx, verified at emit. Every imported component priced through the sovereign landed-cost engine (duties, MPF, HMF, corridor ranking) before it enters the BOM Adoption: LIVE — fully adopted (top of its ladder).
Sourcing-mix and reshore-path pricingMeasured: sp_mix exists in runtime/_hdl_build/nx_sourcing_path.nx, verified at emit. The sourcing-mix pricer walks the path from import-heavy to domestic BOM step by step with incentives as data -- the buy-vs-build and where-to-build instrument Adoption: REGISTERED-DARK — PARTIAL: callable, authorised, no MCP invocation on record (a direct fork logs the runner, so this is not proof it never ran); no execution surface runs it either (clock, cron, daemon, roster, actlog and surfaced forks checked).
adoption REGISTERED-DARK
Domestic supply-chain and good-jobs case for the manufacturing decisionMeasured: sc_domestic_permil exists in runtime/_hdl_build/nx_supplychain_case.nx, verified at emit. Origin class, energy risk, single-source and value roll into weighted risk and domestic-content permil -- the government-facing case a domestic build leads with Adoption: LIB-WIRED importers=3 nonval=2 — fully adopted (top of its ladder).
Go-to-market channel engine (facade live in an adjacent domain)Measured: gtm_channel_best exists in runtime/nx_gtm_svc.nx, verified at emit. The GTM facade ranks channels per product today in the supplement domain -- mover, dealer and property-manager channel rows are a data admission, not new code Adoption: REGISTERED-DARK — PARTIAL: callable, authorised, no MCP invocation on record (a direct fork logs the runner, so this is not proof it never ran); no execution surface runs it either (clock, cron, daemon, roster, actlog and surfaced forks checked).
adoption REGISTERED-DARK
EVIDENCE
Sovereign mirrored and pinned reference register for this fieldMeasured: knowledge/fetched/cmp_appliancemove exists in knowledge/compare/appliancemove.refs, verified at emit. Every rival claim on this page resolves to a mirror in the estate evidence store, content-pinned by hash and re-measured on every emit -- no incumbent publishes its evidence chain Adoption: ABSENT — PARTIAL: no source and no binary: this is a build contract, not a partial deploy.
adoption ABSENT
FIELD
Instrumented field-trial protocol on real stairsOpen — watching runtime/nx_applmove.nx : am_field_gate, re-measured on every compare beat. Ship that symbol and this mark flips itself; the comparewatch- plane row flips with it. Incumbents are proven products; ours is unproven until a field gate exists. Contract = the trial-protocol gate: measured climbs, descents, aborts and floor inspections on declared fixtures, REFUSING to pass on partial coverage
watching am_field_gate

Risk register

Debt register

RiskLikelihood x impactMitigation
Stairs plus heavy loads is an injury domain -- a design error is a person crushedpossible x severenever-ship-without-gate: AM4 lock-on-release refusal, AM3 tipover neg-control, AM7 field gate with abort coverage; no article ships on partial gate coverage
A watch contract flips on symbol existence, so a stub reads greenpossible x highthe flip is the receipt, the rung gate is the proof -- every rung pre-declares its refusal rule
The wedge is real but the unit economics are notpossible x mediumM1 gates hardware spend on the measured BOM verdict; the biz rows regenerate from the costing organs, never from seat optimism
IdSevWhat it isUnblock
am-crawler-teardown3No teardown unit in hand -- the crawler BOM baseline is unpricedbuy one 330 lb-class crawler unit [@crawler]; AM5 prices its BOM as the reference article
On these two registers. Rows are declared in the domain's plan file and carry the debt id, which is the join key back to the sovereign debt plane — that plane, not this page, is the authority on state. Reconciling them automatically (the regen reading the plane and refreshing these rows) is a named, owed rung; until it lands, treat an id here as a pointer to look up, not a status to trust.
Honest verdict. The Aug-2026 field splits into three formats and none spans the whole ask. Air-film movers glide heavy appliances over finished floors on a micro-thin air cushion -- the force to move the load drops to roughly 1 percent of its weight [@airsled] -- but cannot touch a stair. Motorized stair climbers own the stairs: Escalera StairCat lifts to 1200 lb on tempered-aluminum frames [@escalera], the PowerMate M-1 class reaches 1,500 lb with an automatic brake that locks the load the instant the operator releases the controls [@powermate], and the Magliner-distributed Liftkar line covers the ergonomic mid-range [@liftkar] -- all dealer-channel, none of which stays under the appliance. Tracked crawler dollies in the 330 lb class automate the climb at consumer prices on rubber non-marking tracks [@crawler]. The Nishi wedge no incumbent spans: a PERMANENT under-appliance glide base that mates with a detachable stair-climb module, engineered against the published stair envelope (OSHA 1910.25 fixes riser and tread geometry for general-industry stairs, risers capped at 9.5 inches [@oshastairs]), with tipover, load-margin and descent-brake models proven as gated organs BEFORE steel is cut, and the BOM priced through the estate landed-cost and sourcing engines.

Person · product · place — not yet measured for this domain

Every compare carries this layer. Declare knowledge/compare/appliancemove.ppp (rows surface|nishi or c1..c4|label|url|connect naming OUR live surface and each rival's front door), run nx_ppp_probe domain appliancemove, and this section fills itself on the next beat: the same ruler on both sides — privacy and CX (third-party hosts, tracker classes, cookies, security headers), design and longevity (design hygiene, computed WCAG contrast, render-blocking resources, unsized media, script weight, theme and motion queries), findability (landmarks, skip link, on-site search, breadcrumb, headings, internal links).

References

Beyond a link list. Every reference below resolves twice — the publisher's copy and, where banked, the estate's own non-rottable library mirror with a content pin — and carries its evidence class plus the exact claim on this page it grounds. Keyed marks like [key] in the matrix notes jump here. A dash means honestly absent, never assumed.
  1. [airsled] Airsled. How it works -- benefits of air-film load movement. Airsled vendor page -- a micro-thin air cushion under the load cuts the force needed to move it to roughly 1 percent of load weight; floor-safe movement of appliances and equipment. publisher · read in our library knowledge/fetched/cmp_appliancemove_airsled.html · pin hf7d856640e44cc7769d5ea548a36ed05f052b0ae4f395449cabecd5c7840aa91 · accessed 2026-08-19 · vendor-docGrounds: The GLIDE rows and the Airsled column: the incumbent floor-safe glide format the permanent base must match on finished floors.
  2. [escalera] Handtrucks2go. Escalera StairCat stair-climbing hand trucks and forklifts. Dealer catalog page -- tempered-aluminum StairCat line with capacities to 1200 lb, winch-lift variants. publisher · read in our library knowledge/fetched/cmp_appliancemove_escalera.html · pin h96a461d75d465cb4a5894dd9e4fc11b80404dc73dce4df6885f40e83131fb4fd · accessed 2026-08-19 · vendor-docGrounds: The STAIRS powered ascent row and the LOAD capacity row: the professional climber bar at 1200 lb.
  3. [powermate] Handtrucks2go safety blog. Best electric stair-climbing hand truck -- expert comparison (2025, read Aug-2026) -- PowerMate M-1 class at 1,500 lb capacity with a fully automatic braking system that locks the load when the operator releases the controls. publisher · read in our library knowledge/fetched/cmp_appliancemove_powermate.html · pin h941a31bc1655f38876f1a45c3e5842d8f67b2d6caee038161a5b21706ea595cc · accessed 2026-08-19 · mirrored-indexGrounds: The STAIRS load-lock safety row and the LOAD capacity row: lock-on-release is the field safety bar our brake-energy contract adopts as a refusal rule.
  4. [crawler] OzRobotics. Crawler electric stair-climber dolly CT150 -- 330 lb capacity, 400W motor, lithium battery, rubber caterpillar track drive. Vendor product page. publisher · read in our library knowledge/fetched/cmp_appliancemove_crawler.html · pin h7992bac018aa54b290b6de6cec49c773b667f52d526a2a5d2a98cedb43052e4b · accessed 2026-08-19 · vendor-docGrounds: The consumer-price crawler column and the teardown-unit row of the plan: the 330 lb tracked class that automates the climb cheaply.
  5. [oshastairs] OSHA. 29 CFR 1910.25 -- Stairways (general industry). Official regulation text -- standard stairs: maximum riser height 9.5 inches and minimum tread depth 9.5 inches, the published geometry envelope. publisher · read in our library knowledge/fetched/cmp_appliancemove_oshastairs.html · pin hede634ef50186cbb3c59c656a9c84babeef4b65f5c7e36e815941cd57ca5925d · accessed 2026-08-19 · published-standardGrounds: The stair-geometry envelope row and rung AM1: the solver reads this envelope as DATA rather than guessing stair dimensions.
  6. [liftkar] Handtrucks2go. Magliner SAL Ergo Liftkar electric stair-climbing hand truck. Dealer catalog page -- the ergonomic mid-range powered climber line. publisher · read in our library knowledge/fetched/cmp_appliancemove_liftkar.html · pin hc61176d5d0b01e74ab1245fa6d0ca4a85b0afc18c88581c63157aadc14932844 · accessed 2026-08-19 · vendor-docGrounds: The LOAD capacity row mid-range and the go-to-market biz row: the rental and house-call channel shape of the incumbent climbers.

generated by nx_swcompare_matrix (sovereign NishiLang organ) from knowledge/compare/appliancemove.matrix · every Nishi cell verified against organ source at emit time · watch cells re-measured on every compare beat · zero JS, zero trackers