NishiSearch

Web This site Trusted

1 result(s) for “date 202406 site does lanyingim com site upton com site:www.ecfr.gov” · 562 ms

Scope: Nishi’s own index (our crawl + Common Crawl) — not the whole live web. Some sites block all automated crawlers (anti-bot walls), so their pages may be absent here even though we never filter lawful content.

Did you mean date 202406 site does lanyingim com site upon com site:www.ecfr.gov?

Freshness: no result on this page carries a fetch time yet (indexed before the fetch epoch was stored beside the doc)

(2) Where space is allocated to different functions and metering does not allow unambiguous measurement of usage by function, costs must be allocated as follows: (i) Utilities costs should be apportioned to functions in the same manner as depreciation, based on the calculated difference between the site or building
from the top result below

eCFR :: 2 CFR Part 200 -- Uniform Administrative Requirements, Cost

https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200
This web site is designed for the current versions of Microsoft Edge, Google Chrome, Mozilla Firefox, or Safari